Pump Technical Resources

Use the YSM resource center to prepare an ANSI process-pump enquiry, resolve common selection questions and request controlled technical documents. Educational guides are published separately from model-specific curves, drawings, certificates and case evidence.

Start here

Pump Selection Resources

ANSI Pump Selection Guide

Follow a six-step checklist covering duty, liquid, suction, pump family, material, seal and technical documents.

Open the selection guide

ANSI Process Pump FAQ

Review concise answers about series ranges, BEP, NPSH, low-flow service, self-priming layouts, materials, curves and replacement parts.

Open the FAQ center

Cast Alloy Reference for ANSI Pumps

Cast designations and ASTM specifications for wet-end alloys, from WCB and CF8M to CD4MCu, nickel alloys and titanium.

Open the alloy reference

Standards and sizes

ANSI Pump Standards and Size Guides

What Is an ANSI Pump?

The pump type defined by ASME B73.1: design features, typical uses, materials and how it differs from ISO and API process pumps.

Read what an ANSI pump is

ANSI/ASME B73.1 Explained

What the standard fixes, what it leaves open and how dimension designations group pump sizes.

Open the B73.1 guide

How to Read ANSI Pump Size Codes

Nozzle order, impeller size, group prefix and suffix letters, with a Goulds 3196 pattern to Durco Mark 3 pattern conversion table by designation.

Read the size code guide

ANSI, ISO and API Pump Standards Compared

ASME B73.1, B73.2 and B73.3, ISO 2858, ISO 5199 and API 610: which fix dimensions and what that means for a replacement.

Compare the standards

Replacement and interchange

Replacement and Interchange Guides

Goulds 3196 Replacement Pump Manufacturers

Compare OEM, non-OEM and repair routes for a Goulds 3196 from published sources, with the checks to confirm against the nameplate and installed pump drawing.

Compare replacement routes

G196 vs Goulds 3196 Interchangeability

See the ASME B73.1 envelope dimensions by designation, what YSM designs itself and the nameplate and installed pump drawing data that confirm fit before order.

Open the G196 guide

YSM D Mark III vs Durco Mark 3

Check Groups 1 to 3, seal chamber options, dimensions by designation and the Mark 3A caveat before a D Mark III order.

Open the D Mark III guide

ANSI Pump Power Frame Cross-Reference

Line up STX to XLTX frames and Mark 3 groups across common B73.1 pump families before a changeover review.

Open the frame chart

Goulds and 3196 are trademarks of ITT Inc.; Durco and Mark 3 are trademarks of Flowserve. YSM Pumps is an independent non-OEM manufacturer, not affiliated with either company; model names identify the dimensional pattern only.

Controlled Document Areas

Technical Downloads is maintained as a revision-controlled index. Materials Compatibility and Case Studies stay unpublished until the supporting evidence, ownership and customer authorization are complete.

Technical review required

Pump Materials Compatibility

Framework for component-level material, liquid, concentration and temperature review.

Authorization pending

Industrial Pump Case Studies

Evidence template for verified duty, supplied scope, measured outcome and customer authorization.

Revision controlled

Pump Technical Downloads

Current revisions of G196 and D Mark III curves, sectional drawings with parts lists, installation dimensions and interchange tables, the S series catalogue, and printable RFQ and nameplate worksheets.

Open technical downloads

Technical Document Request Matrix

NeedSend firstReview outcome
Performance curveDuty point, model/size if known, speed and liquid dataApplicable curve or clarification request
GA or dimensional drawingModel, size, configuration and intended useRevision and scope confirmation
Parts identificationNameplate, photos, drawing and part referenceReviewed parts proposal
Manual or quality documentModel/order context, required document and languageAvailability and issue conditions

Pump Technology Articles

Read practical guides on pump priming, mechanical seal types, seal replacement and seal-face material factors, then return to the RFQ form with the actual project data.

Request Project-Specific Documentation

Send the model, duty point, liquid data, destination and required document type. Availability is confirmed during technical and commercial review.

Explore Pump Engineering Fundamentals

Contact Us